PROJECTS Following is a snapshot of some previously completed ATS projectsĄ Royal Brisbane Hospital Client: Delta/Abigroup Duration: 7 months Works Description: Removal of hazardous waste materials from the 16 level building under full asbestos conditions. 1700 tonnes of asbestos, which was placed in 10,200 lined 44 gallon drums for disposal. At the peak of the contract ATS had 85 employees on site. Removal works were continuously progressed on multiple levels at any given time. To allow access to the site for other contractors and for civilian traffic to access neighbouring buildings, various floors had to be completed in several stages. Hilton Hotel Client: Delta P/L Duration: 12 months Works Description: Friable and Bonded asbestos removal from the entire 45 level building. Passive demolition throughout building. Prince Henry at Little Bay (retained building remediation) Client: Landcom C/O Cadence Australia Duration: 14 months Works Description: Removal of Friable and Bonded asbestos from the buildings including that contained within the sub floor and ceiling cavity. Replacement of roof cladding, wall cladding, eaves cladding etc to the buildings to heritage specifications. Removal of Friable asbestos lagged pipes from beneath the roadway. IVECO P/L Client: Julian Lee Duration: Staged works over a 6-month period Works Description: Remove and replace AC Roof and Wall sheeting Royal Melbourne Hospital Client: RMH/Leighton Construction Duration: Staged work program Works Description: Friable asbestos, pipe lagging, vinyl floor tiles, gaskets Royal Children's Hospital | ||||