PROJECTS
Following is a snapshot of some previously completed ATS projectsĄ­

Royal Brisbane Hospital
Client:
Delta/Abigroup
Duration: 7 months
Works Description: Removal of hazardous waste materials from the 16 level building under full asbestos conditions. 1700 tonnes of asbestos, which was placed in 10,200 lined 44 gallon drums for disposal. At the peak of the contract ATS had 85 employees on site. Removal works were continuously progressed on multiple levels at any given time. To allow access to the site for other contractors and for civilian traffic to access neighbouring buildings, various floors had to be completed in several stages.

Hilton Hotel
Client: Delta P/L
Duration: 12 months
Works Description: Friable and Bonded asbestos removal from the entire 45 level building. Passive demolition throughout building.

Prince Henry at Little Bay (retained building remediation)
Client: Landcom C/O Cadence Australia
Duration: 14 months
Works Description: Removal of Friable and Bonded asbestos from the buildings including that contained within the sub floor and ceiling cavity. Replacement of roof cladding, wall cladding, eaves cladding etc to the buildings to heritage specifications. Removal of Friable asbestos lagged pipes from beneath the roadway.

IVECO P/L
Client: Julian Lee
Duration: Staged works over a 6-month period
Works Description: Remove and replace AC Roof and Wall sheeting

Royal Melbourne Hospital
Client:
RMH/Leighton Construction
Duration: Staged work program
Works Description: Friable asbestos, pipe lagging, vinyl floor tiles, gaskets

Royal Children's Hospital
Client: Kane Constructions
Duration: Staged work program
Works Description: Friable asbestos, pipe lagging, vinyl floor tiles, gaskets

Carbrini Hospital
Client: Construction Engineering
Duration: Staged work program
Works Description: Friable asbestos

Queensland Alumina Limited
Client: QAL
Duration: Ongoing
Works Description: Friable asbestos, pipe lagging, hot strips